top of page
Description

Canyon Road fronts a newly constructed, high traffic destination park. The existing striping needed to be reconfigured to meet the increased demand of the park. This project consisted of mill/overlay and restriping. A predevelopment and post development data capture was necessary for the Utah Department of Transportation.

Details

Size:

3 acres (1800 LF)

Time Onsite:

30 Minutes (x2)

Location:

Spanish Fork, Utah

Deliverables

2D model features of existing road and existing striping. Post flight re-striping verification and pay takeoffs.

Category:

Type:

Transportation

Construction Assistance

bottom of page