Green Bay Beef Processing
Description
The industrial plant operates six days per week, limiting survey access to one day per week. Ground-based survey of all manmade and natural features and building heights, adjacent roadways and railway would have required five full days across four weeks to complete. Instead, drones mapped the site in 1 hr.
Details
Size:
19 acres
Time Onsite:
1 hour
Location:
Green Bay, Wisconsin
1/2
Deliverables
Linework for all features
Contours, Points and Terrain Model
Category:
Type:
Industrial
ALTA/Topo Survey