top of page
Green Bay Beef Processing
Description

The industrial plant operates six days per week, limiting survey access to one day per week. Ground-based survey of all manmade and natural features and building heights, adjacent roadways and railway would have required five full days across four weeks to complete. Instead, drones mapped the site in 1 hr.

Details

Size:

19 acres

Time Onsite:

1 hour

Location:

Green Bay, Wisconsin

Deliverables

Linework for all features
Contours, Points and Terrain Model

Category:

Type:

Industrial

ALTA/Topo Survey

bottom of page