top of page
Canyon Road
Description
Canyon Road fronts a newly constructed, high traffic destination park. The existing striping needed to be reconfigured to meet the increased demand of the park. This project consisted of mill/overlay and restriping. A predevelopment and post development data capture was necessary for the Utah Department of Transportation.
Details




1/4
Size:
3 acres (1800 LF)
Time Onsite:
30 Minutes (x2)
Location:
Spanish Fork, Utah
Deliverables
2D model features of existing road and existing striping. Post flight re-striping verification and pay takeoffs.
Category:
Type:
Transportation
Construction Assistance
bottom of page