Description

The earthwork and utility spoils were long on the first two phases of this residential development. For this third phase, the developer and engineer decided to calculate precise utility spoils volumes to determine if additional grading adjustments were needed.

Details

Size:

28 acres

Time Onsite:

30 min

Location:

North Aurora, Illinois

1/4
Deliverables

Digital Terrain Models

Category:

Type:

Single Family Residential

Volume